Yeah. It's done. Rack version 2.0 is done. In and out of home depot in 45 minutes. Came out of there with some rubber pipe couplings and some nuts, bolts and washers. I ended up drilling through the base carrier bars to mount them. The smoothest part is that I offset the bars so Its much easier to put the boards on. (the bindings stay in the middle) Here are the pics of my handiwork.


No comments:
Post a Comment